- Would you like to discuss it?
- Do you require any technical advice?
- Are you looking for inspiration?
Geneva Airport
Architects: de Giuli & Portier Architectes SA
The construction of the new East Wing of Geneva Airport was a major project extending over several years.
To cover the growing needs of passengers during the construction phase, a temporary terminal has been built with shops, bars and waiting areas. RMIG has manufactured and supplied 500 m2 of perforated aluminium panels for the facade of the terminal, giving a solid finish to this temporary building. The perforated sheets have been powder coated, giving them a long outdoor life and protection from corrosion.
Raw material: Aluminium
Pattern: R5T8
Thickness: 3.0 mm
Finishing operation: Bending
Surface treatment: Powder coating
© 2009 - City Emotion